After six hours of work and a few cracking setbacks, my hot dog is a little longer. I have to keep rolling it until I get it down to 3mm wire.
Saturday, September 20, 2008
Getting there
After six hours of work and a few cracking setbacks, my hot dog is a little longer. I have to keep rolling it until I get it down to 3mm wire.
Thursday, September 18, 2008
Tuesday, September 2, 2008
hot dog
After six hours, this is what my gold now looks like. The end goal is 3 mm wire. I remelted it into a hot dog shape and then put it through the roller about a million times. I can only roll it about five times before I have to anneal it. Annealing involves heating it up until it almost melts and then putting it in the pickle (a liquid bath) to get rid of the "dirt" that gets on it from annealing. It keeps starting to crack along the top (you can kind of see this in the picture) and I've had to slightly remelt it once already to fix this. When you remelt it, you kind of have to start all over again. I'm trying to be patient.
Thursday, August 28, 2008
$425 worth of gold
Thursday, August 21, 2008
First Piece
I got to reminiscing about the very first piece I made when I started taking metalsmithing classes back in SF. The days of the deer (and big belts) are slipping away, but I still love this buckle (especially the green eye!).
Tonight I'm starting a gold class at 174 Studio in Williamsburg. I've only worked in silver, brass, copper, etc. so I'm super excited to work with a new metal. We start with pure 24 karat gold and custom alloy it to create 14 karat gold in a custom color. Then I'll make a piece with it. Stay tuned...
Wednesday, August 20, 2008
Subscribe to:
Posts (Atom)






